Subcontracting is one of the manufacturing strategy by which a company decides to outsource some or all of its production operations to a vendor. In SAP, Subcontracting is one of the special procurement type in the SAP MM.
Subcontracting can be defined as the processing of the material by the external supplier to get the final products.
In this process, a manufacturing company provides raw materials/ components to a subcontracting vendor. The vendor in turn process these components to turn them into end products. This final product is then used by the manufacturing company to carry out the rest of the operations.
After GST Implementation, there is a change in the Subcontracting Configuration and Process.
As per GST law, we can run Subcontracting process in one of the following ways:
- With Challan
- Without Challan (with Invoice)
Subcontracting Configuration for GST
- Define Shipping Data for Plants: Assign Sales Organization, Distribution Challan and Division should be maintained for Supplying Plant from which the components are to be delivered. Table view – V_001W_IV, T. Code – SM30 Or SPRP -> SAP Ref. IMG -> Materials Managment -> Purchasing -> Purchase Order -> Set up Stock Transport Order -> Define Shipping Data for Plants
- New Billing Type define – ZSN SC Challan (No Taxes), ZSP – SC Invoice (with Taxes)
- Classify Subcontracting Billing Types: Maintain View J_1IG_V_SUBINV through Code – SM30 – Company Code, Sales Type, Billing Type, Billing Class – ZSN for Create Challan and ZSP for Create Invoice
- Use the existing SD Pricing Procedure or define a new Pricing Procedure for Subcontracting process
- Set up “Delivery to Billing Type” Copy Control. Copied with Billing Type “FX” and Sales Order “OR
Steps for Subcontracting Process:
- Material Master - Material Master should be available in system for both Finished and Raw Materials (T. Code – MM01). Components must have stock in the system. Extend the Sales View for the Raw Materials or Components
- Customer - Create Customer (T. Code – XD01) with necessary details as per Subcontractor Vendor
- Vendor - Maintain Subcontractor Vendor (T. Code – XK01) and assign Customer in the Vendor Master data.
- Sales Condition Record - Maintain Sales Condition Record for Material Pricing (T. Code – VK11)
- Subcontracting Info Record - Create Subcontracting Info Record (T. Code – ME11) (Optional)
- Subcontracting Purchase Order - Create Subcontracting Purchase Order (T. Code – ME21N) against Subcontracting Vendor with Item Category L. This will activate the “components” button in the Material data tab in the Item of the Purchase Order. Explode BOM or maintain the components manually and with zero tax
- Goods Issue to Subcontractor - Enter Transfer Posting with reference to Subcontracting Purchase Order through (T. Code MIGO/ MB1B)using 541 Movement type. This will issue the material to the Subcontractor. No Accounting Document generate at the time of Transfer Posting. This will update the stock of the material in the Stock Provided to Vendor in Stock Overview.
- If we are using T. Code – ME2O for issuing components to vendor, then system will create Outbound Delivery. And then Go To Change Delivery (T. Code – VL02N) to do PGI, which will generate Goods Issue document using Movement Type – 541.
- Subcontracting Challan - Create Subcontracting Challan with reference of Material Issue Document through T. Code -J1IGSUBCON. Then create Challan using “With Challan”, this will generate the Billing Document (ZSN – SC Challan Document in SD). No taxes have been maintained in the Challan Document. Any changes can be done in the Billing Document by using T. Code – VF02.
- Post Goods Receipt - When Vendor sends the materials, we post the Goods Receipt in the system using T. Code – MIGO with reference to Subcontracting PO having Movement Type 101 for final or end products and Mov. Type 543 for Components. Consumption of Components material from the Vendor Stock and Stock update for the Final Products.
- Reconcile Challan - Reconcile Challan with reference to goods receipt material document through T. Code – J1IGRECON. Select Manual and enter the Challan No. and Save the Data.
- Invoice Receipt - Post Invoice Receipt for Subcontracting Vendor for the service charges paid to the Subcontractor through T. Code – MIRO with reference to Subcontracting PO
Accounting Entries at the time of Goods Receipt:
BSX – Stock A/C for Assembly/ Semi-Finished – Dr. 11000
BSV – Change in Subcontracting Stock Cr. 11000-
FRL – Subcontracting Charges Dr. 10000
WRX – GR/IR Clearing (Semi-Finished) A/C Cr. 10000-
BSX- Stock A/C for Components Cr. 1000
GBB-VBO Consumption A/C for Components Dr. 1000
Accounting Entries at the time of Invoice Receipt:
GR/IR Semi Finished Clearing A/C Dr. 10000
IGST or SGST/CGST Taxes A/C Dr. 900, 900 (CGST/SGST) or 1800 (IGST)
Vendor A/C Cr. 11800
T. Code - MBLB To display Stock to Subcontractor
useful information thanks for uploading
ReplyDeleteThis comment has been removed by a blog administrator.
DeleteThis comment has been removed by the author.
ReplyDeleteThis document very helpful for subcontracting process after GST.
ReplyDeleteThanks
Very helpful and nice document
ReplyDeletePlease don't use other blogs for your marketing
ReplyDeleteuseful docs
ReplyDeletethank you for the useful in formations. can you upload some enhancement in sap mm
ReplyDeleteThis comment has been removed by a blog administrator.
ReplyDeleteNice post.
ReplyDeleteSelenium online training
Selenium training
Spark online training
Spark training
splunk admin online training
splunk admin training
splunk development online training
splunk development training
splunk online training
splunk training
sql azure online training
sql azure training
sql plsql online training
sql plsql training
sql server dba online training
sql server dba training
sql server developer online training
sql server developer training
nice
ReplyDeleteSap ABAP On Hana training
SAP Grc training
SAP Secrity training
oracle sql plsql training
Hi Rita, I have a question. I've done all configuration in OBYC but the account document of GR is wrong. The line of BSX does not equals to sum of FRL and GBB(VBO). how this happens? Did i miss any configuration? Thanks for your advice.
ReplyDeleteThe State government of West Bengal offers an online portal named grips portal
ReplyDeletewhere all the citizens of the state can pay taxes. Grips Challan Reprint West Bengal is a portal launched by WBIFMS
If you are looking for GST Litigation Services in Delhi, they specialize in assisting businesses and individuals with navigating disputes and legal challenges related to Goods and Services Tax. These services encompass comprehensive legal representation, including dispute resolution, appeals, and advisory on GST laws and regulations.
ReplyDeleteAs you are saying that after GST implementation, to run the subcontracting process we have to assign Sales Area (let's suppose it is 1000-10-10) to Supplying Plant. But suppose we have to run STO from the same Plant but Sales Area is different for STO (let's suppose it is 2000-20-20). How we can assign 2 different Sales Area to 1 Plant?
ReplyDelete